Tour Manhattan
Courbevoie - France
THE CONTEXTE :
The manager of the Manhattan Tower in La Défense called on Plafometal to renovate the ceilings of one of the building's floors.
For the circulation areas and elevator access, PM8 self-supporting panels, which are fire-resistant for half an hour, were installed.
When it came to product selection, we needed to offer a solution that closely resembled the old ceilings, specifically clip-on ceilings on hidden frames.
CLIENT NEEDS:
- Renovation of a platform
- Products identical to previous ones
- Short lead times.
OUR RESPONSE:
For this office space, Plafometal proposed the installation of MONOBAC, cassettes clipped under a hidden frame.
The panels were custom-designed and manufactured for this project. To optimize production time and reduce lead times, all panels are the same size and were ordered at the same time. For aesthetics, trapezoidal-shaped catch strips were added to the MONOBAC to create a rotating effect.
For the circulation areas and elevator access, self-supporting PM8 panels are fire-resistant.
Monobac cassettes
The + product
The MONOBAC cassettes installed in the Manhattan Tower are all the same size and custom-made for the project. They feature a clip-on suspension system on hidden frames. The cassettes provide sound absorption of up to 1 (Optimal Sound Absorption Index).
- A monolithic appearance
- Ideal for premises where hygiene requirements are required
- Secure access to the plenum requires the use of a disassembly tool.
PM8 self-supporting tray Fire-resistant.
The + product
Their implementation is facilitated thanks to installation on an angle iron, without intermediate frames.
- The length of the trays can be adapted to each individual requirement.
- The trays can be supplied with folded ends for greater lateral rigidity.
- Fire-resistant for half an hour.
- They are easily disassembled, simply lifting them up to provide full access to the plenum.
Informations chantier
- Surface area: 1,400 m²
- City: Courbevoie
- Country: France
- Premises: Offices
- Completion date: October 2015