Swiss Life Offices
Bruxelles - Belgique
THE CONTEXT:
Swiss Life called on Plafometal to renovate over 900 m² of ceilings in its vast open-plan offices in Brussels. The challenges of this project were to combine comfort and safety: half-hour fire resistance to comply with current fire regulations while also achieving the best possible sound absorption.
CUSTOMER NEEDS:
- Compliance with Belgian standard NBN 713-020 regarding fire resistance
- Optimal acoustic comfort
- Aesthetic solution
OUR RESPONSE:
Plafometal proposed a Fire Stable (SF) ceiling system, combining:
- Acoustic comfort: αw up to 1.
- Fire resistance to meet French and Belgian standards
- Ease of installation
- Aesthetics
To meet our client's request, we proposed the PM8 system on a flat rail, a self-supporting tray with hooks intended for offices and halls from the SF range, filled with bagged mineral wool to obtain the best possible absorption coefficient: αw=1 (Alpha Plus offer).
For this project, Plafometal manufactured and delivered 1792 PM8 hook trays measuring 1732x300mm, with 11% perforation Ø1.5mm in a pre-painted white color.
PM8 SF ON SMOOTH
- Fire-resistant for 30 minutes to comply with French and Belgian regulations.
- Designed for slatted installation on flat rails or 100mm hollow joints: ideal for offices with removable partitions.
- The tray has hooks and has joined edges and sharp corners.
Product advantages:
- Easily removable by simply lifting the tray.
- Absorption αw=1
- Hooked tray for improved stability
- Improved lateral rigidity (with straight raised ends)
Informations chantier
- Surface area: 931 m²
- City: Brussels
- Country: Belgium
- Premises: Offices
- Date of completion: 2018